भारतीय रेल · INDIAN RAILWAYS · Northern RailwayDivision: Delhi (DLI) · Zone: NR

Failure & Breakdown Analytics

Failure register — trend, classification, repeat patterns

3 Jul 2026, 7:44 pmData updated: just now
Failures (90 days)
15
Open Failures
1
Avg Restoration
94 min
Failure Categories
4
AI Pattern Detection — Repeat Failure Locations
  • Section AK-BSL (Contact Wire) — 3 similar failures. Recommend root-cause investigation.
  • Section BSL-KNW (Dropper) — 3 similar failures. Recommend root-cause investigation.

Failure Trend — Monthly

Failure Classification

  • OHE Failure10
  • PSI Failure2
  • SCADA Failure2
  • External Power1

Repeat Failure Locations

  • AK-BSL
    Contact Wire
    3× repeated
  • BSL-KNW
    Dropper
    3× repeated

Failure Register

Section / TSSTypeEquipmentCauseDurationOccurredStatus
AK-BSLOHE FailureContact WireWire snap – under investigation29/6/2026, 12:18:55 pmOpen
TSS-IGPPSI FailureTransformerBushing flashover98m29/6/2026, 6:58:55 amClosed
BSL-KNWOHE FailureDropperBroken dropper125m28/6/2026, 10:58:55 pmClosed
BSL-IGPSCADA FailureRTUComm link failure45m27/6/2026, 12:58:55 pmClosed
AK-BSLExternal PowerFeeding PostGrid disturbance62m26/6/2026, 12:58:55 pmClosed
BSL-KNWOHE FailureInsulatorInsulator flashover110m24/6/2026, 12:58:55 pmClosed
BSL-NGPOHE FailureJumperLoose jumper75m23/6/2026, 12:58:55 pmClosed
AK-BSLOHE FailureContact WireWire wear180m17/6/2026, 12:58:55 pmClosed
MMR-DDSCADA FailureRTUComm link38m14/6/2026, 12:58:55 pmClosed
BSL-IGPPSI FailureBreakerBreaker stuck55m9/6/2026, 12:58:55 pmClosed
AK-BSLOHE FailureContact WireWire wear155m4/6/2026, 12:58:55 pmClosed
BSL-KNWOHE FailureDropperBroken dropper88m26/5/2026, 12:58:55 pmClosed
AK-BSLOHE FailureInsulatorPollution flashover95m22/5/2026, 12:58:55 pmClosed
BSL-KNWOHE FailureDropperBroken dropper92m5/5/2026, 12:58:55 pmClosed
AK-BSLOHE FailureInsulatorInsulator crack104m22/4/2026, 12:58:55 pmClosed